RAPPORT-SOMMAIRE POUR LES CONSULTATIONS A COURT...

RAPPORT-SOMMAIRE
POUR LES CONSULTATIONS A COURT TERME DU PROJET NRBAR
. .
NOM DU CONSULTANT: Hannibal Muhtar
AGENT RESPONSABLE: - ISRA: Ndiaga Dieng, Aminata Badiane
- CID: Tom Cusack
DATE D¡¯ARRIVEE: 27 Nov. 1995
HEURE: 20:OOpm
DATE DE DEPART: ayh= 4s
HEURE: 11:30am
MISSION ET TERMES DE REFERENCE:
1. Finir les travaux de la mission d¡¯ocrobre 1995 et pr¨¦parer la mission du 09 Janvier 1996.
2. Faire le suivi du programme de d¨¦veloppement de la gestion des stations.
TACHES ACCOMPLIES:
1. R¨¦alisation d¡¯un document technique sur la possibilit¨¦ de consolider les sites de I¡¯ISRA
dans le Cap Vert.
2. Ren¨¦gociation du contrat de I¡¯AGETIP pour la r¨¦habilitation des stations.
3. D¨¦veloppement et ¨¦bauche d¡¯un plan d¡¯action pour 1996 avec budget sous le projet
NRBAR.
4. D¨¦veloppement avec Ndiaga Dieng des termes de r¨¦f¨¦rence des responsables des stations.
RENCONTRES AVANT/APRES LA MISSION: ISRA:N/A USAID:N/A(Sept-O&
DOCUMENTS JOINTS OU CITES:
- ETENDU DU TRAVAIL:
v
- EMPLOI DU TEMPYITINERAIRE: -
- RAPPORT DU CONSULTANT:
J
- AUTRES:
SUIVI:
1. Proposition par Hannibal des termes de r¨¦f¨¦rence de sa prochaine mission de Janvier 1996
2. Incorporation des plan et budget dans le plan d¡¯action 96 du projet NRBAR par CUSACK
COMMENTAIRES
Mission accomplie dans les d¨¦lais et tr¨¨s utile.
LE PRESENT RAPPORT EST REDIGE PAR: Hannibal Muhtar
SIGNATURE DU CHEF DE MISSION DU PROJET NRBAR/CID:~,,C+.¡®L,
DATE:
ei DEC 95

LETTER SUMMARY REPORT FOR NRBAR TDY
ARRIVAL DATE: 27-r~~~
TIME:
$22 L 0
DEPARTURE DATE: a d;--i
TIME:
ilh?J
IN1TIAL/EXIT MEETINGS: ISRA
J /4
USAlb wfA
RELATED DOCUMENTS A-JlACHED OR REFERENCED:
-SCOPE Of WORK:

t-¡¯
(¡¯
-TIMESHEET/lTINERARY:
d
-TDY R E P O R T : -
-0THER:

. iiiQ 4-L?+ - w-p
THIS REPORT PREPARED BY:
/
CID NRBAR COP SIGNATURE: (1 .- [ . km,%
DATE: 1 ~ky7/

i-i r
r
. .
. .
1¡¯. .
. .
¡®#
l *¡®. ;¡¯ . . .;
Matk l ach
dry whh on. 01 lho foRowIng rcmnymr:
l HOW8
HOWS
A = Annutl Lttvt
3 ? Stck Lcovt
W l bty Wwked
L 9 ?t4v* Wllhoul Pty
WJE ? Wctktnd
&jpiu
L¡± em

SUPPLEMENTARY TERMS OF REFERENCE FOR I3ANMBALmm
SHORT VISIT PROPOSED FOR NOVEMBER 1995 (PART OF OCT95 TDY)
TERMES DE REFERENCE POUR UNE MISSION D¡¯APPUI DE
HANN-IBAL MUHTAR SUR LA GESTION DES STATIONS
(28NOV95)
1. INTRODUCTION
Dr. Muhtar will be travelling through Dakar on bis way to other West Al?ican countries during the
last week in November, 1995. He will take this opporhmity to continue bis work with ISRA under
his TDY approved in October 1995, which was somewhat shorter than anticipated. No transport
costs will be paid by NRBAR for this activity, as Hatmiial will already be in Dakar.
II. OBJECTIFS
As& TSRA staff to:
A. Determine so&vare and management needs of the inventory system with the inventory consultant
already on site.
B. Complete the contract amendment for the AGETIP work.
C. Draft a plan and budget for 1996 station management activities to be f¨´nded by NRBAR.
D. Write a feasiiility report for consolidation of ISRA sites in Cap Verde.
E. Draft a revised TOR for station managers.
III. PLAN DE TRAVAIL
Meet and work with ISRA, CID and USAID stafF in completing the above objectives.
IV. SCHEDULE
27NOV aniv¨¦e ¨¤ Dakar
28-3ONOV travail ¨¤ Dakar.
0 1DEC d¨¦part Dakar.
V. LE CONSULTANT(S)
Hannibal Muhtar: see documentation for the October 1995 TDY.

ACTXVITIES AiiD PEOPLE ENCOUNTERED
Monday November 27, 1995
arrived Dakar at 7:55 p.m. Was met by the driver and John Ashbumer. Registered in the hotel
Lagon 2. Had dinner with John and discussed the work he was doing in the inventory.
Tuesday November 28,199s
At 7:3O am the driver Cis came and took me to the ISRA DG building. Meetings undertaken:
1. Met with Dr. Tom Cusack, the project chief of Party and Ms. Rochelle Reimy. Discussed
the TOR of the mission. Concerning the inventory being carried out, the plan of activities
for the 1996.
3
-.
Met with Ndiaga DIENG, the SG of ISRA and discussed the activities put in place since
the October mission.
3. &fet with David Holmes discussed the plans under way to invite bids for a package for the
development of an accounting package. Also discussed the management of stations and
the software required for that.
1. Met with Dr. Paul Anamosa and discussed the introduction of GIS to station management,
It was agreed that the GIS package will be Atlas-GIS which Will be introduced by means
of training courses and also the rehabilitation plans being developed.
5. Met with Dr. Wendy Wilson and discussed the need to welcome farmers to ISRA stations.
The idea is to reduce the formality of station security, yet without the compromise of the
station and research integrity.
6. Met with Moustafa DIOP. Went together to AGETIP. Discussed the access of the data
needed for stations. Discussed also the extra work required for the SANGALKAM and
MORO stations. Will offer the AGETIP a proposa1 tomorrow at 4:30. Then we will meet
again with them on Thursday at 15:00 p.m. Some of the extra work is needed to
commence prier to the arriva1 of equipment to Bambey. The work can¡¯t commence before
the World Bank gives its non-objection.
Wednesday November 29,1995.
Met with DG for 2.5 hr. Discussion conceming rearranging the Cap Verte installations of
ISRA. Met with Dr. Tom Cusack and discussed a list of needed items for station management
1996. Apparently at least an additional 80 hectares Will need to be developed at the
SANGALKAM station.
Visited the LNERV area and looked at it with ides of the DG¡¯s demand. Had a meeting with
AGETIP concerning the needed work and compensation for work that has been delayed.
Thursday November 30,199s
had a meeting w-ith Dr. Tom Cusack,, Dr. Aminata Badianne, Ndiaga Dieng and John
Ashbumer. Discussed the inventory and possible management tools for the managers to handle
the invetiory. I&d a meeting with tom Cusack at 14:00 conceming the items required as
management and training needs of stations. This lasted till 17:00 p.m. Met with Antoine
DLALLO, discussed the possibility of working together on some projects.
Friday December 1,1995
Meeting with Dr. Tom Cusack, and left documents for the DG. Also the required letters for
the NIORO and SANGALKAll management needs. Left the airport at 9:15 am.

TERWS DE REFERENCE
DZTPIJ
GESTIONNAIRE DE CENTRE ET STATIONS
1 FtESPONSABILITES
1 . Le gestionnaire de Centre et stations est place sous la responsabilit¨¦ hi¨¦rarchique du
Secretaire General ¨¤ qui il rend compte.
2 . Il est responsable de toutes les activit¨¦s dans le Centre (et/ou les stations) autres que celles de
recherche ou rattach¨¦es aux programmes de recherche.
3. Il est charg¨¦ de la gestion courante des besoins du Centre (et/ou des stations). Le Directeur
de Recherche lui assigne les besoins saisonniers; pour les besoins courants, il est inform¨¦ par
le comit¨¦ de gestion et/ou les chercheurs.
4. Ses responsabilit¨¦s sont ¨¤ 100% de gestion et sont r¨¦parties comme suit:
*
Gestion administrative et financi¨¨re,
l
Gestion du domaine (implantation et suivi technique des essais, production, etc.. .),
b
Entretien et maintenance des ¨¦quipements et infrastructures.
II ATTRIBUTIONS
1 . S¡¯assurer que le Directeur de Recherche ou le Chercheur-leader sont inform¨¦s de tous les
aspects du Centre ou de la Station.
2 . V¨¦rifier si toutes les op¨¦rations administratives sont men¨¦es dans le respect des proc¨¦dures
(Manuel de Proc¨¦dures) et r¨¦glements.
3. Pr¨¦parer le budget annuel du Centre ou de la Station.
4. Suivre et contr?ler le budget pour une mise ¨¤ disposition effective des ressources financi¨¨res.
5. Suivre r¨¦guli¨¨rement les comptes et la tr¨¦sorerie pour une meilleure gestion des fonds.
6. Planifier les besoins et les achats.
7 . Pr¨¦parer ies demandes d¡¯acquisition et les suivre aIin de s¡¯assurer que les fournitures et
¨¦quipements demand¨¦s sont disponibles.
8. Choisir la main-d¡¯oeuvre et le personnel journalier comp¨¦tents pour assurer leur disponibilit¨¦
au moment opportun.
9. Surveiller la distribution des ouvriers journaliers suivant les priorit¨¦s et les demandes des
programmes.
In
_ J . Etablir des niveaux de rendement ad¨¦quats des ouvriers et surveiller l¡¯efficacit¨¦ du travail
fourni aux programmes de recherche.
11. V¨¦rifier p¨¦riodiquement que la r¨¦glementation du travail est respect¨¦e.
1.2 . Repr¨¦senter le Directeur G¨¦n¨¦ral pour tous les aspects l¨¦gaux dans la zone d¡¯infIuence du
Centre ou de la Station.
13 . Etudier les protocoles de recherche avant d¡®installer les essais.
14 . Pr¨¦parer les calendriers des activit¨¦s pour toutes les op¨¦rations majeures dans le Centre ou la
Station :

15. pr¨¦paration des sols,
16. besoins en main-d¡¯oeuvre,
17.
approvisionnements,
18. entretien des essais et autres productions, . .
19. V¨¦rifier si les travaux au niveau des parcelles sont faits conform¨¦ment aux besoins de la
recherche et des autres activit¨¦s.
2 o . S¡¯assurer que les activit¨¦s de production sont men¨¦es conform¨¦ment aux imp¨¦ratifs
d¡¯homog¨¦n¨¦isation des parcelles et que les rotations sont faites convenablement.
2 1 . S¡¯assurer que le personnel est toujours motiv¨¦ et comprend la nature et les objectifs des
recherches entreprises.
22 . S¡¯assurer que tout le personnel du Centre ou de la Station est correctement form¨¦ pour une
ex¨¦cution convenable des travaux demand¨¦s. Cette formation pourra ¨ºtre assur¨¦e, le cas
¨¦ch¨¦ant, par le Gestionnaire du Centre ou de la Station, ses assistants ou l¡¯aide ext¨¦rieure.
bd.
: 2 Programmer toutes les activit¨¦s du Centre ou de la Station, telles l¡¯entretien ou le
fonctionnement.
i
m l1 . \\¡®¨¦rifier que tout le mat¨¦riel disponible sur le Centre ou la Station est maintenu selon les
sp¨¦cifications techniques et les cahiers des charges.
2 5 . V¨¦rifier que tous les b?timents et installations sont maintenus selon les r¨¨gles de l¡¯art.
; G . Veiller ¨¤ ce que l¡¯¨¦vacuation des ordures, des r¨¦sidus de pesticides ou autres est faite dans
l¡¯optique d¡¯une meilleure gestion de la s¨¦curit¨¦ et de l¡¯environnement.
27 . Surveiller toutes les activit¨¦s du Centre OU de la Station par des visites fr¨¦quentes faites dans
toutes les parcelles, les bureaux et autres parties.
2 8 . Appliquer les r¨¨gles d¡¯hygi¨¨ne et de s¨¦curit¨¦ pour toutes les activit¨¦s du Centre ou de la
Station en vue du bien-¨ºtre de tout le personnel.
2 9 . S¡¯assurer que toute la production faite sur le Centre ou la Station est utilis¨¦e ou vendue
suivant le manuel des proc¨¦dures.
3 o . Examiner p¨¦riodiquement l¡¯ensemble des rapports ¨¦labor¨¦s par les diff¨¦rentes sections du
Centre ou de fa Station.
31 . Elaborer un rapport mensuel pour le Directeur des Recherches d¨¦taillant toutes les activit¨¦s
men¨¦es.
32 . Maintenir constamment un contact et une communication avec le personnel du Centre ou de
la Station et les programmes de recherche pour assure une meilleure productivit¨¦.
3 3 . D¨¦l¨¦guer ses responsabilit¨¦s ¨¤ ses assistants et autres personnes comp¨¦tentes.